News

|  May 2020  |

Next project for Enovos in Luxembourg about to start

After having already installed three PV projects for Enovos in Luxembourg in 2019, we will start with the installation of a further plant in June. The new plant with an output of 2.68 MWp will once again be carried out in cooperation with our ARGE partner Paul Wagner et Fils S.A.



|  April 2020  |

AVANTAG Energy® s.à r.l. makes the roofs of the VGP sustainable

Over the past years we have already built several PV systems with a total power of more than 13 MWp on VGP rooftops following a leasing model. VGP has now decided to operate its own PV systems on their roofs throughout Germany. We are very pleased that VGP has chosen us as a partner for this. As a first step, approximately 10 PV systems with 750 kWp each are to be built in 2020.



|  February 2020  |

Cooperation with the Stadtwerke Trier picks up speed

We are pleased to continue carrying out projects for our partner SWT Stadtwerke Trier Versorgungs-GmbH this year. These include a ground-mounted photovoltaic system at the waterworks in Irsch, a 750 kWp rooftop photovoltaic installation on the building of the SWT transport unit (SWT-Vertriebsbetriebe), and an additional rooftop photovoltaic installation on the Kylltal waterworks.